{"id":1498,"date":"2017-12-24T15:45:45","date_gmt":"2017-12-24T15:45:45","guid":{"rendered":"https:\/\/www.aiminsight.com\/?p=1498"},"modified":"2020-04-27T13:32:35","modified_gmt":"2020-04-27T20:32:35","slug":"it-would-be-hart-to-make-manufacturing-processes-more-efficient-and-flexible-without-disrupting-them","status":"publish","type":"post","link":"https:\/\/www.aiminsight.com\/blog\/uncategorized\/it-would-be-hart-to-make-manufacturing-processes-more-efficient-and-flexible-without-disrupting-them\/","title":{"rendered":"Ineffective cost control and high overhead of manufacturing operations: It would be hart to make manufacturing processes more efficient and flexible without disrupting them"},"content":{"rendered":"<p><em>In the conference room are meeting: Christian (CFO), Irene (IT Manager), Paul (Purchasing Manager),<br \/>\nPeter (Production Manager), and Enrique (Engineering Manager)<br \/>\n<\/em><\/p>\n<p>The Agenda title:<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.aiminsight.com\/blog\/wp-content\/uploads\/2017\/12\/ineffective-cost-control-high-overhead-manufacturing-operations3.png\" alt=\"Ineffective cost control and high overhead of manufacturing operations\" \/><\/p>\n<p>Although it varies from company to company, you might want to examine the following:<\/p>\n<ul>\n<li>How do you ensure that production in progress is in line with planning and expectations, and does not result in cost overruns? Has it happened that you ran into cost-growing tendencies?<\/li>\n<li>How were you able to change direction in those instances? Were you satisfied with the speed and impact of that aspect of cost management?<\/li>\n<li>How do you manage material requirements so you do not run out of needed item or component quantities? Is that cost-effective?<\/li>\n<li>Can you easily modify the way you assemble or make products, if you become aware of an opportunity to introduce better economy or efficiency?<\/li>\n<li>How often do you need to make adjustments to your manufacturing process? How smooth and manageable are those periods?<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>In the conference room are meeting: Christian (CFO), Irene (IT Manager), Paul (Purchasing Manager), Peter (Production Manager), and Enrique (Engineering Manager) The Agenda title: Although it varies from company to company, you might want to examine the following:&#8230; <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-1498","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/posts\/1498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/comments?post=1498"}],"version-history":[{"count":3,"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/posts\/1498\/revisions"}],"predecessor-version":[{"id":2274,"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/posts\/1498\/revisions\/2274"}],"wp:attachment":[{"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/media?parent=1498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/categories?post=1498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aiminsight.com\/blog\/wp-json\/wp\/v2\/tags?post=1498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}